Client: Stoughton Area School District
Location: Stoughton, WI
Completed: 2012
Cost: $20,224.00
FEI Services: Analysis, Design, and Construction Administration
Contractor: Zander Insulation, Inc.
Stoughton Area School District maintenance planning observed declining conditions surrounding the pre-cast concrete walls surrounding the high school field house. A study by FEI ensued. FEI determined cracking inherent to fabrication, exacerbated by our climate’s influence, produced irreversible effects. This rendered the wall panels subject to ultimate failure should action be postponed.
FEI designed a clad-over system consisting of exterior insulation and finish (EIFS). EIFS adds energy-efficiency and aesthetics while preserving the core structure.
FEI provided design and construction administration services.