Barneveld HS Building Envelope Rehabilitation

Client: Barneveld School District

Location: Barneveld, WI

Completed: 2011 

Cost: $67,000.00

FEI Services: Roof Rehabilitation,  Analysis, Design, and Construction Management 

Contractors: Hellenbrand Glass, LLC, Nieman Central Wisconsin, Roofing Co., Inc., and Zander Insulation, Inc.

 

Barneveld School District consists of __ facilities. The high school is a cluster of numerous vintage building portions with various exterior systems. The District aspired to maintain systems while giving regard to options for replacements affording increased life-cycles.

Roofing systems required replacement including demolition, carpentry, application of new roofing systems and accessory sheet metal. Selected repairs were performed on roofing systems deemed salvageable.

Other building exterior systems requiring maintenance attention were window, doors, and masonry. Where possible, walls were enhanced thermally with the use of an exterior insulation-and-finish system (EIFS) cladding, providing added efficiency and aesthetics.

Additionally, equipment, controls, and ductwork were integrated to supply the school building with a solar collector.