FEI conducted analysis and assessment of existing (asphalt and concrete) pavements, curb and gutter, and related site drainage issues, with particular attention paid to the drive lane in front of the school. Inspection included observation, soil boring and SPT boring. FEI compiled findings into a formal report detailing the Project Scope, Executive Summary, Observations, and Recommendations.
FEI provided RFP composition and minimal construction administration, including observation, for scheduled asphalt pavement repairs at Abraham Lincoln, Northside, and Parkside Elementary Schools. This consisted of bituminous (parking lot) rehabilitation and associated landscape restoration.
Madison College is a … Their campus at Madison, also known as Truax, is the primary site for academic, athletic, and civic congregation. As such, the parking and related roadways amount to __ square yards of asphaltic concrete pavement.